Thursday, March 13, 2008

Welcome To WACUMAN Inc










Our Beginnings




Established on the year 2006, the Waste Custodian Management, through its proponent, Mr. Ramon C. Angelo, Jr., had a simple yet noble vision: to provide the most modern and state of the art waste disposal solutions and to properly address the need for a suitable and eco friendly facility to cater the different types of waste disposal programs of Local Government Units (LGUs) and private entities.


With its simple and humble beginnings, the company has now evolved into a formidable corporation as WACUMAN, Incorporated, and is considered to be as a major key player promoting environment-friendly waste disposal solutions in compliance with the standards set by by the Department of Environment and Natural Resources (DENR), relative to the problems of waste disposal we continue to face everyday.



Our Facility




Situated in the mountainous region of Norzagaray, Bulacan in our Category 4. 18-hectare sanitary landfill that boasts of the most modern facility in proper waste handling and management. With the advent of new and modern ways of waste handling and disposal, we strive to keep at par with the most developed sanitary landfill facilities in South East Asia and other parts of the world.


Pursuant to the guidelines and provisions of the Philippine Republic Acts 9003 and 6969, Wacuman has strove hard to construct and develop a “World Class” sanitary landfill facility through means of effective research and a realistic approach – made possible by the company’s reliable team of geological experts from the University of the Philippines in Los Banos, Laguna.


With its “inverted pyramid” system, the facility is considered the most suitable and effective place for the final disposal of almost all types ofwastes. Many consultants, experts, engineers here and from abroad have attested to this perspective, proving indeed that the WACUMAN sanitary landfill facility is unique in design, construction and purpose/ truly, others have labeled it as, “a waste memorial park “.







Gate






Route to Facility




Administration Office




Roads Leading To Hole # 1






First Phase of Development-Hole # 1 (foreground) 14,000 square meters


Overview Of Hole # 1



Hole # 1 (Ground View,showing methane Gas Vents)



Leachate Pond ( Treatment Facility)











Our philosophy








WACUMAN stands on its strong commitment in being a major partner in the care and preservation of the fundamental aspects of our environment . our adherence and full compliance to local and national environmental laws is just a clear testament of our strong vision to promote the ecological balance and environmental welfare and society.










Name of Corporation: WACUMAN, Inc.
Site Address: Sitio Tiakad, Baranggay San Mateo, Norzagaray Philippines.
Telephone No. 427-6063 / 0917-516-6066 / 0923-360-5656
Environmental Compliance Certificate No. 03BU 0606 20 176-120A
SEC Reg. No. CS200719794
TIN No. 006-940-320-000

Nature of business:
Waste disposal Facility; Waste Management; Waste Hauling and Transport; Construction and Engineering; Consultancy
Contact Person(s): Mr. Ramon C. Angelo, Jr. – Chairman and CEO






WACUMAN Sanitary Landfill Facility General Info:





Owned an Develop by: WACUMAN, Inc

Sanitary Landfill Category: 4

Volume Capacity: 200 Tons per Day ( Minimum)

Total Land Area (current) : 188,000 square meters

Landfill Area (current): 120,000 square meters

Total Land Area: 1,500,000 square meters

Distance



from Quezon City Memorial Circle: approximately 25 km via Payatas-La Mesa Dam bypass Road



from Bocaue-NLEX tollgate: approximately 36 km via Bocaue-Sta Maria-Norzagaray route





Phase 1 (hole#1)


  • "Inverted Pyramid" system

  • 14,000 square meters (base)

  • Multi-lining system consists of 1.5mm thick High Density Polyethylen Liner,Non woven Geo Textile and 3 inches of gravel and sand

  • Approximate volume capacity is 2,700,000 cubic meters

  • Approximate depth is 70 meters


Leachate Treatment Pond : 2,200 Square meters


Aeration Tank : 800 Square Meters



Phase 2 (hole #2 to # 9)



  • Under Construction and Development

  • Provisions (cells) for Industrial and Healthcare (treated) wastes

Type of Treatment Used in Waste Handling / Fumigation:


Chemical - uses the organic compound BIO SAFE, a non toxic and biodegradable disinfectant, deodorizer, decompressor and oil and grease dispersant solution without harming the ecological system, marine life and both organic and inorganic matter



Faclities:



  1. Administration Building

  2. Division Offices

  3. Viewing Deck

  4. Parking Area

  5. Nipa Huts

  6. Water Tank

  7. Power Station

  8. Material Recovery Facility

  9. Motor Pool

  10. Canteen

  11. Fire Safety and Emergency Services Building

  12. Multi Purpose Hall

  13. Fuel Depot

  14. Commercial /Office Spaces

  15. Restrooms



References:


http://www.malaya.com.ph/feb09/metro4.htm



1 comment:

Anonymous said...

The contact number posted here 0917-516-6066 no longer belong to WACUMAN INC. Globe Telecom may have re-issued this contact to someone else which should not happen at all. But to some unknown reason it was renewed to their other customers. Shame on them.

To the owner of this site please change your contact details accordingly to avoid unnecessary inconvenience to the others. Thank you!